Institutional Construction

planeterium

Anderson Hancock Planetarium

Marietta College's new facility boasts a 130-seat theater, a research lab, and a multimedia lobby, allowing the college to add a new Astronomy minor.

Barnesville Middle School, Ohio Construction, Grae-Con

Barnesville Middle School

This 16-month project was completed in time for the start of the school year and allowed for the old middle school to be turned into an elementary school.

Bellaire Middle School Grae-Con Construction

Bellaire Middle School

This facility was a 15-month project that was turned over 2 months ahead of schedule.

Harding Middle School Construction Grae-Con

Harding Middle School

The Harding Middle School was built on a compact site next to an existing school and required significant ground and soil preparation.

Lincoln County High School Grae-Con Construction

Lincoln County High School

Grae-Con served as lead contractor for this facility, which housed a vocational school, six combined high schools and a community college.

Marietta College Legacy Library Grae-Con Construction

Marietta College Legacy Library

This four level structure features a bell-shaped dome metal roof, full brick and cast stone veneer and courtyard with amphitheater.

Marietta Sports Intro

Marietta College Sports Fields

The college's existing football field was revamped with new turf and a drainage system, a new running track, a competition soccer field and softball field.


mellot memorial

Mellot Memorial Library

This facility received a handful of unique features, from a pop-up roof to natural wood and slate finishes.

Steubenville High School Construction

Steubenville High School Addition

This addition to Steubenville High School included a 3,200-seat gymnasium with suspended running track and a natatorium with an eight-lane Olympic pool.

Union Local Schools Construction Grae-Con

Union Local Schools

This new construction and renovation project put the high school, middle school and elementary school in one location for a campus-type setting.
Wellsville High School Institutional Construction Grae-Con

Wellsville High School

Constructed on a compact site between a highway and residential area, this new high school has four separate wings with the latest technological features.

Fairlawn Baptist Church Construction Grae-Con

Fairlawn Baptist Church

This design/build project was an addition to the existing facility, encompassing a 1,000 seat sanctuary, choir loft and classrooms.
South Parkersburg Baptist Church Construction Grae-Con Institutional Construction

South Parkersburg Baptist Church

Another successful design/build project, this addition included a 1,500 seat sanctuary, 2,400 square feet of offices, and various renovations to the existing building.

st ambrose

St. Ambrose Church & Rectory

The unique design and construction of this Catholic worship center earned us two awards! Featuring tall stain glass windows, wood and stone in a semicircular design, it's a spacious gathering place filled with light.
Washington County Jail Institutional Construction Grae-Con

Washington County Jail

Grae-Con served as the general trades contractor and construction manager for this $7.6 million facility with a capacity of 124 beds.