SO3 Mitigation System

Industrial Construction
in Belmont, WV

Grae-Con was the General Contractor for the procurement and installation of the SO3 Mitigation Treatment Building. The project consisted of deep foundation piling, concrete foundations, structural steel, tank setting, piping, equipment setting, electrical work, siding, roofing, HVAC, area paving and containments. The SO3 Building was 80’-0” Long by 40’-0” wide by 27’-0” high. The 4.5 million dollar project was completed in 24 weeks.

Project Info

Client:
First Energy Corp./
Allegheny Energy Service

Architect:
Worley Parsons

Project Manager:
Thomas H. Andrix

Project Superintendent:
Ron Ryan