First Energy-FGD

Industrial Construction
in Stratton, OH

Grae-con was proud to be part of the 1.7 billion dollar fuel gas desulfurization project at the First Energy Sammis Power Station in Stratton, Ohio. Grae-Con completed over 20 million dollars worth of work on the project that included a design/build of a 40,000 square foot, 2 story, warehouse and office building, the design/build of the wastewater treatment facility, and the architectural finishes package for the FGD project that included all masonry, studs, drywall, and miscellaneous steel work.

Project Info

Bechtel Power

Bechtel Power

Project Manager:
Thomas H. Andrix

Project Superintendent:
Jim Dodds